Gaya APA
Bakosurtanal, . (1992).
Twenty-Sixth full technical report period September 1, 1992-December 1, 1992 and December 1992: Technical advisory team (TAT) consulting services to National coordination agency for surveys and mapping (TransmigrationV-IBRD project) LOAN No. 2578/IND .
Cibinong:
Bakosurtanal.
Gaya MLA
Bakosurtanal, .
"Twenty-Sixth full technical report period September 1, 1992-December 1, 1992 and December 1992: Technical advisory team (TAT) consulting services to National coordination agency for surveys and mapping (TransmigrationV-IBRD project) LOAN No. 2578/IND".
Cibinong:
Bakosurtanal,
1992.
Text.