Text
Report of the review team for the project LTA-7a/b (Dok.22/1977)
at this mid-project point (the project covering the period from about 1 January 1975 to about 1 April 1980), theresult of the evaluation of the Indonesian - Dutch review team might be summaried in very few words as follow: the school: 1 asuccess the consulting: in progress the mapping centre: difficulties in the beginning, but at present the situation has been considerably improved On the following 11 pages, the review team presents its detailed report.
DK.1977-22 | Dokumen 1977/22 BAD r | Perpustakaan BIG | Tersedia |
Tidak tersedia versi lain