Text
National resources survey and mapping project IBRD LOAN No.1197-IND: progress report no.3 for period ending March 31, 1978 (Dok.06/1978)
In this period the main ativities of the National Resources Survey and Mapping Project have been dedicated to the following: a. Construction of the laboratory building B. Design and development of the technological and institutional support systems and the introduction of above system c. Development of training facilities and conduct of training d. purchase of equipment e. Initiate the compilation of available data and the production of landcover maps f. Finalization of the CIDA component.
DK.1978-06 | Dokumen 1978/06 BAD n | Tersedia |
Tidak tersedia versi lain